Under Rulemaking 11-09-011, the CPUC adopted three major decisions, in which ORA advocated for and which are outlined in detail below.
CPUC Decision on Rule 21 Reforms
In September 2012, the CPUC issued
Decision
(D.12-09-18) approving the first set of reforms to Rule 21 establishing a process to accommodate the interconnection of exporting generating facilities. If the exporting generating facility does not have an impact on the distribution system, it can interconnect after a fast track study is completed – this study is quicker than the previous process and accommodates the facility to come on line more quickly. Under this reform all requests made to the utilities to interconnect to their distribution systems would be designated to one of two major study tracks to be performed by the utilities:
The Fast Track:
A streamlined interconnection review process for which Net Energy Metering, non-export facilities (not exporting energy to the distribution system), and some exporting facilities are eligible. To be eligible for the Fast Track, an applicant must meet a series of requirements.
The Detailed Study:
A more lengthy interconnection review process should the applicant not meet the requirements set forth in the Fast Track process.
The ORA generally agreed with the work leading to this decision but advocated for primary focus on the cost certainty issue, introduced in initial comments
here
and discussed in detail further in this webpage.
CPUC Decision on Requiring “Smart” Inverters
On December 12, 2014, the CPUC issued
Decision
(D.14-04-003) requiring new inverters used by interconnecting generating facilities to have enhanced technical capabilities. The ORA supported that the design of these new inverter standards to allow interconnected generating facilities to offer system support functions to distribution or transmission system operators. ORA
recommended
that cyber-security be included separately but not within the scope of Rule 21 as the working group proposed.
CPUC Decision on Cost Certainty for Interconnection for New Technologies
On July 1, 2016, the CPUC issued
Decision
(D.16-06-052) to: (1) provide earlier and more reliable interconnection cost information (also known as Cost Certainty), for electric generation developers to ensure that the interconnection process is timely, non-discriminatory, cost-effective, and transparent, (2) set forth a streamlined process for analyzing requests for interconnection of electricity storage devices and (3) set forth guidelines for the revision of Rule 21 to incorporate the technical recommendations of the Smart Inverters Working Group (SIWG) for additional advanced inverter functions, otherwise known as Smart Inverters.
Cost Certainty
R.11-09-011 was initiated to address complaints by the Interconnection Applicants who were not getting early, reliable and cost certain interconnection cost information from the utilities. Through its advocacy addressing the issues raised by the Applicants, ORA was able to achieve higher level of Cost Certainty for the Applicants which may lead to keeping rates down for ratepayers through the reforms ordered in D.16-06-052. For more information on ORA’s advocacy work, click
here
for lobbying materials,
here
for comments, and
here
for reply comments on this issue.
CPUC Proceeding Docket
See the R.11-09-011
Proceeding
docket.
Side Navigation Menu Begins - Skip Menu
Home
About the Public Advocates Office
Contact the Public Advocates Office
Job Opportunities
Public Events
Public Advocates Office Reports
Accessing Public Advocates Office Pleadings
Energy
Climate Change
Customer Rates
Cost of Capital
Catastrophic Events
Energy Rate Cases
Rate Design
R & D
Smart Grid
Nuclear
Demand-Side Strategies
Advanced Metering Infrastructure
Energy Efficiency
Smart Grid
Deployment
Metrics
Privacy
Demand Response
Distributed Energy Resources
Energy Storage
Electric Vehicles
NEM 3.0: Reforms to Rooftop Solar Incentives to Promote Equity
Transportation Electrification
Integrated Distributed Energy Resources
Low Income Energy Assistance Programs
San Joaquin Disadvantaged Communities
Natural Gas
Pipeline Safety
Cost Allocation
Gas Incentive Mechanisms
Procurement
Long-Term Procurement Planning
Resource Adequacy
Oakley Power Plant
Joint Reliability Plan
Renewable Portfolio Standards
Safety
Transmission
Alberhill Substation
South Orange County Reliability Enhancement Project
Rule 21
Western Transmission Grid Expansion
Water
Cost Of Capital
Conservation
Water Revenue Adjustment Mechanism
Customer Rates
Apple Valley Ranchos
California American Water GRC
Monterey Peninsula Water Supply Project
San Clemente Dam Removal
Sand City Desalination
California Water Service GRC
Great Oaks Water GRC
Park Water Company
San Gabriel Valley Water GRC
San Jose Water GRC
Santa Catalina GRC
Suburban
Valencia
Golden State Water
Drought
Acquisitions
Communications
Broadband
Consumer Protection
AT&T and T-Mobile Merger
Competition OII
Customer Rates
Kerman
Siskiyou
Volcano
Mergers
Public Purpose Programs
CA High Cost Fund-A
CA Lifeline Program
Service Quality
Video Franchising
Legislation
2021 Legislative Session
2019 Legislative Session
2018 Legislative Session
2017 Legislative Session
2016 Legislative Session
2015 Legislative Session
2014 Legislative Session
2013 Legislative Session
2012 Legislative Session
2011 Legislative Session
2010 Legislative Session
2009 Legislative Session
2007-08 Legislative Session
Press Room
Public Advocates Office Investigation Into SoCalGas Pro-Gas Advocacy.
Legal Pleadings
Data Requests and Selected Data Responses
Additional Items of Interest
Cal Advocates In The News
Press Releases by Year
Side Navigation Menu Ends